Manufacturing & quality
Manufacturing & quality
From film slitting and winding to sealing and 100% electrical test, our core processes run in-house at our Jiangmen Xinhui production base.
- 3
- Film capacitor categories
- 100%
- Electrical test before packing
- XX+
- Years of manufacturing (TBC)
- XX M
- Monthly capacity, pcs (TBC)
Production process
- 01
Material inspection
Incoming metallized film, zinc-spray wire, leads and flame-retardant cases are checked against specification before release to production.
- 02
Slitting & winding
Metallized film is slit and wound or stacked on automated machines with tension and alignment control.
- 03
Metal spraying & heat treatment
End-face spraying and controlled heat treatment stabilise the winding and its contact resistance.
- 04
Lead attachment & encapsulation
Leads are welded, then elements are potted in flame-retardant cases or epoxy-coated.
- 05
Electrical test
Capacitance, dissipation factor, insulation resistance and withstand voltage are tested on every piece.
- 06
Reliability verification
Sampled lots undergo life, damp-heat and temperature-cycling tests in our own lab.
Reliability lab
- Endurance (life) testing at rated voltage and temperature
- Damp heat, steady state and temperature cycling
- Temperature-humidity-bias (THB 85°C / 85% RH) endurance testing
- High dV/dt pulse and ripple current testing
- LCR, insulation resistance and Hi-pot measurement
- Solderability and dimensional inspection
Production base & office
Jiangmen · Xinhui (Production Base)
Main manufacturing base integrating R&D, film capacitor production, quality testing and administration.
Dongguan · Songshan Lake (Office)
Additional office location in Songshan Lake, Dongguan.
Certificates
Certificate documents are being uploaded. Contact sales for copies.
Need samples or a BOM quotation?
Add series to your RFQ list or upload a BOM. Our sales engineers reply within one business day with pricing, lead time and sample availability.